5Ws 1H: A technique to improve Project Management Efficiencies
Project management can be regarded as a multipurpose techno-managerial activity. The diversity of its applications necessitates making PM inclusive. One way to do that is to broaden its knowledge circumference by integrating new tools and techniques with an aim to enhance the quality of PM processes and the quality of products / services produced using these processes. Yet, in hindsight, it seems that use of quality management tools and techniques have not captured the deserved attention from people working on the projects. There could be several reasons; from people lacking knowledge or intent (or both) of how to use quality management in projects, to a more systematic problem of lack of integration of tools, techniques, standards and general awareness for people to use quality management techniques regularly and effectively.
With an intention to build further thought and propose some new tools / techniques, one technique that carries good potential for use in PM for problem solving is called by the name 5Ws 1H (or sometimes 5Ws 2H).
5Ws 1H (or 2H) explained
5Ws stand for What, Why, When, Where, and Who. 1H (or 2H) stands for How (and How much). For a detail description of origin and history of the concept, see https://en.wikipedia.org/wiki/Five_W
What: Thinking of What initiates the process of understanding the basics of issue, problem or scenario at hand. It is about cognitive mapping of the scope of the issue, problem, or scenario.
Why: Asking ‘Why’ entails clarifying why the issue, problem or situation at hand occurred. It aims to identify the triggers and rationalizes the occurrence of an issue or a problem.
When: This element is about time-stamping the occurrence of an issue or a problem. Having an understanding of the time of occurrence could help in sequencing the triggers and impact of the issue, or problem.
Where: This element is used to pinpoint the location or place of occurrence and hence could be helpful in identifying the people and other things present / existing at that location which may have contributed to the occurrence of an issue or problem.
Who: This is about identifying people who may have direct or indirect involvement in causing or contributing to the issue or problem.
How: This element of technique is used to examine the sequence of things and triggers and how the resultant problem or issue unfolded.
How much: This indicates the quantity, volume or size.
5Ws 1H (or 2H) explained through a project management-based scenario.
Taking a Software development project as an example, we consider a scenario where development team has found that technology they are using is not fully compatible with the existing systems of their client, as was previously thought. So the project team can consider using 5Ws 1H (or 2H) to understand the problem and its extent of impact.
1. What: The team can ask following questions to build an understanding of the fundamental problem and scope of the problem
- What is the technology we are using for software development?
- What technologies were considered initially for this development project?
- What was known about the existing system(s) of client?
- What checks and verifications were done to confirm the compatibility of the technology being built and the deployment acceptability of new technology on existing client system(s)?
- What (if any) approved or unapproved modifications / changes have been made following discussions on technological compatibility since the start of the project?
- What expertise is available to the team to help them understand the compatibility issue?
- What are the accepted processes for managing compatibility and technological synergies?
- What guidelines or standard operating procedures (SOPs) are available to deal with such issues?
- What actions were taken once the problem was detected?
2. Why: The project team may ask ‘Why’ questions to get a more granular understanding of the problem and seek to clarify triggers or drivers that may have contributed to the issue. Some of the questions that can be asked are:
- Why has it happened that two technologies are now found to be incompatible?
- Why was this problem not identified earlier or at the start of the project?
- Why technologies cannot be made compatible?
- Why were quality assurance processes not able to detect the problem?
- Why were project team or experts involved in the project not able to detect the problem?
3. When: By using ‘When’ questions, project team members can time stamp the events and understand the relationships among various events that may have influenced the emergence of incompatibility issue.
- When was the problem first detected?
- When was client system(s) information / architecture evaluated?
- When were compatibility issues mapped and discussed?
- When were any compatibility tests done and compatibility found acceptable?
- When was any incompatibility impact assessment done?
- When was the matter taken up with client or client informed?
4. Where: By asking ‘Where’ questions, project team can get a better handle of source(s) of the problem. Some questions that can be asked:
- Where are client system(s) located?
- Where are development teams located?
- Where are quality assurance / testers located?
- Where is documentation on system compatibility kept?
- Where is any approval / change management documentation on system architecture and compatibility kept?
5. Who: The project team can ask questions to identify the people involved in contributing to the issue. Some questions that may be asked:
6. How: To understand the sequence of various inter-related events, the project team can ask how questions such as:
7. How much: A later addition to 5Ws 1H technique, this element is used to gauge the size of the impact. Some questions that can be asked are:
Concluding thoughts:
Integration of new tools and techniques should be an ongoing process to deal with emergence in project management practices. In particular, problem solving and quality management techniques could help improve the overall effectiveness of project delivery. 5Ws and 1H (or 2H) technique is simple, logical and has what it takes to be used with minimum cost to the project. Practicing it on regular basis could help project teams to become naturally more problem-solution oriented. It is important to note that the list of questions used above is for illustration purposes only and should not be considered exhaustive or complete.
Acknowledgement
Special thanks to post-write-up contributions by Roger Tagg.

Jiwat is a Professor in Project Management. He has considerable experience of working internationally in diverse cultures and business environments.
Jiwat is currently serving on the Editorial Board of International Journal of Project Management.
Jiwat actively contributes to project management community. His work has been published in top scientific journals and Four of his published papers have remained in Top25 most downloaded papers. Additionally, two of his papers have been ranked as the Most Cited article published since 2012. More recently, he has published a number of articles on some of the issues confronting project management in various industry based outlets.
Most Read
-
15 June 2018 | 7:26
5Ws 1H: A technique to improve Project Management Efficiencies
-
29 January 2018 | 8:13
5S (or 6S) Lean Management technique: Possible uses in project management
-
02 February 2018 | 2:32